Radio Regulations

Source: the Radio Regulations published by the International Telecommunication Union (ITU).

WRC Agenda Item WRC-27 AI 1.14
AI

1.14

WRC-27 · Agenda item 1.14

to consider possible additional allocations to the mobile-satellite service, in accordance with Resolution 254 (WRC-23)

Shared frequency bands

View full cross-reference →

Bands this agenda item addresses jointly with other WRC-27 items (CPM Report Table 1). Click a band to open its spectrum page.

Also studied under: AI 1.12 AI 1.13

At a glance Beta

Governing resolution
Responsible group WP 4C
Agenda-item type Technical

The band and its sensitive neighbours

2.01–2.025 GHz 2.12–2.16 GHz FIXED MOBILE Space operation 2.025–2.11 Space operation 2.2–2.29 1.99 2.01 2.025 2.12 2.16 2.17 2.31 GHz
FIXED
MOBILE
MOBILE-SATELLITE
Space operation

Blocks group a service with its direction and mode variants; the table names each allocation as the Radio Regulations name it.

Current framework

Services in this band

FIXED Primary
MOBILE Primary
Mobile-satellite (Earth-to-space) Primary Region 2 only
Mobile-satellite (space-to-Earth) Primary Region 2 only

What's being studied — points to watch

Terrestrial IMT in the same bands

2110–2170 MHz carries IMT base-station downlinks and 2010–2025 MHz runs in TDD mode, with railway control systems in portions; new MSS must coexist with these deployed networks.

Adjacent TT&C bands

2025–2110 and 2200–2290 MHz are heavily used by space operation, EESS and space research for telecommand, telemetry and tracking; they must not be degraded.

Regional asymmetry

Region 2 already has primary MSS at 2010–2025 and 2160–2170 MHz and secondary at 2120–2160 MHz; the item extends the allocations to Regions 1 and 3 and 2120–2160 MHz globally, possibly upgrading secondary to primary (Res. 254).

No additional constraints

Res. 254 requires protection of existing primary services in the candidate and adjacent bands without imposing additional regulatory or technical constraints on them.

Preparation timeline

  1. Dec 2023 WRC-23 agenda adopted
  2. Dec 2023 CPM 27-1 studies allocated
  3. ITU-R studies 2026
  4. ITU-R studies 2027
  5. 5–15 Apr 2027 CPM 27-2 final report
  6. RTO Prep meetings 2027
  7. 11–15 Oct 2027 RA-27
  8. 18 Oct–12 Nov 2027 WRC-27

Spotted an inaccuracy in this analysis? Please let us know via the contact form →

Source: ITU Radio Regulations, editions of 2008, 2012, 2016, 2020 and 2024. The English, French and Spanish texts are each taken from the official edition in that language, not translated from one another. Sources and citation.