Radio Regulations
Source: the Radio Regulations published by the International Telecommunication Union (ITU).
1.3
WRC-27 · Agenda item 1.3
to consider studies relating to the use of the frequency band 51.4-52.4 GHz to enable use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space), in accordance with Resolution 130 (WRC-23)
At a glance Beta
The band and its sensitive neighbours
Blocks group a service with its direction and mode variants; the table names each allocation as the Radio Regulations name it.
Current framework
Services in this band
| FIXED | Primary |
| FIXED-SATELLITE (Earth-to-space) | Primary |
| MOBILE | Primary |
Key figures in today's rules
| Parameter | GSO | Non-GSO |
|---|---|---|
|
FSS gateway access today
No. 5.555C
|
min. antenna 2.4 m | no access yet |
|
Emissions in the passive bands
50.2–50.4 / 52.6–54.25 GHz
|
all emissions prohibited (No. 5.340) | |
|
Unwanted emissions from FSS
|
limits apply | |
Reference figures, verified against the Radio Regulations.
What's being studied — points to watch
Neighbouring passive bands
Keep gateway out-of-band emissions out of 50.2–50.4 and 52.6–54.25 GHz (EESS passive), vital to weather observation.
Terrestrial fixed & mobile
Set PFD/e.i.r.p. so high-power NGSO gateway uplinks do not raise interference to fixed and mobile services.
Revising FSS conditions
Whether the primary FSS allocation's conditions can be adapted for NGSO gateways without reopening the band's balance.
Aggregate from many gateways
Constellations use many gateways; Res. 130 requires the aggregated interference from GSO and NGSO gateways together to be bounded, not just the single-station case.
Radio astronomy (No. 5.556)
Observations at 51.4–54.25 GHz run under national arrangements; Res. 130 tasks studies to set conditions protecting them from NGSO gateway operation.
Preparation timeline
-
Dec 2023 WRC-23 agenda adoptedDec 2023 WRC-23 agenda adopted
-
Dec 2023 CPM 27-1 studies allocatedDec 2023 CPM 27-1 studies allocated
-
ITU-R studies 2026ITU-R studies 2026
-
ITU-R studies 2027ITU-R studies 2027
-
5–15 Apr 2027 CPM 27-2 final report5–15 Apr 2027 CPM 27-2 final report
-
RTO Prep meetings 2027RTO Prep meetings 2027
-
11–15 Oct 2027 RA-2711–15 Oct 2027 RA-27
-
18 Oct–12 Nov 2027 WRC-2718 Oct–12 Nov 2027 WRC-27
-
Dec 2023 WRC-23 agenda adopted
-
Dec 2023 CPM 27-1 studies allocated
-
ITU-R studies 2026
-
ITU-R studies 2027
-
5–15 Apr 2027 CPM 27-2 final report
-
RTO Prep meetings 2027
-
11–15 Oct 2027 RA-27
-
18 Oct–12 Nov 2027 WRC-27
Spotted an inaccuracy in this analysis? Please let us know via the contact form →
Source: ITU Radio Regulations, editions of 2008, 2012, 2016, 2020 and 2024. The English, French and Spanish texts are each taken from the official edition in that language, not translated from one another. Sources and citation.