Radio Regulations
Source: the Radio Regulations published by the International Telecommunication Union (ITU).
1.2
WRC-27 · Agenda item 1.2
to consider possible revisions of sharing conditions in the frequency band 13.75-14 GHz to allow the use of uplink fixed-satellite service earth stations with smaller antenna sizes, in accordance with Resolution 129 (WRC-23)
At a glance Beta
The band and its sensitive neighbours
Blocks group a service with its direction and mode variants; the table names each allocation as the Radio Regulations name it.
Current framework
Services in this band
| FIXED-SATELLITE (Earth-to-space) | Primary |
| Radiolocation | Primary |
| Earth exploration-satellite | Secondary |
| Standard frequency and time signal-satellite (Earth-to-space) | Secondary |
| SPACE RESEARCH | Secondary |
Key figures in today's rules
| Parameter | GSO | Non-GSO |
|---|---|---|
|
Min. antenna diameter
|
1.2 m | 4.5 m |
|
PFD at coast / border
for antennas below the diameter threshold
|
≤ −115 dB(W/m²·10 MHz) | |
|
Radar e.i.r.p. (RLS/RNS stations)
|
≤ 59 dBW (>2° elev.) / 65 dBW — unchanged | |
|
SRS mask 13.77–13.78
|
≤ 4.7·D + 28 dB(W/40 kHz) | |
Reference figures, verified against the Radio Regulations.
What's being studied — points to watch
Replace the size proxy
Revisit the minimum antenna size and its associated power limitations (Res. 129) — keep today's interference ceilings without the fixed-diameter proxy.
Non-GSO minimum size
The 4.5 m floor is the most consequential number for new constellations — the likeliest focus of debate.
Space-research mask
Re-express the 13.77–13.78 GHz e.i.r.p.-density mask for small antennas without weakening deep-space protection.
Coast & border PFD
Show smaller, higher-power terminals still meet the coastline and border limits that shield radar.
Radar that can't coordinate
Ship and mobile radiolocation stations cannot be notified under No. 11.14, so coordination cannot fix interference — hard limits carry the protection (Res. 129).
Preparation timeline
-
Dec 2023 WRC-23 agenda adoptedDec 2023 WRC-23 agenda adopted
-
Dec 2023 CPM 27-1 studies allocatedDec 2023 CPM 27-1 studies allocated
-
ITU-R studies 2026ITU-R studies 2026
-
ITU-R studies 2027ITU-R studies 2027
-
5–15 Apr 2027 CPM 27-2 final report5–15 Apr 2027 CPM 27-2 final report
-
RTO Prep meetings 2027RTO Prep meetings 2027
-
11–15 Oct 2027 RA-2711–15 Oct 2027 RA-27
-
18 Oct–12 Nov 2027 WRC-2718 Oct–12 Nov 2027 WRC-27
-
Dec 2023 WRC-23 agenda adopted
-
Dec 2023 CPM 27-1 studies allocated
-
ITU-R studies 2026
-
ITU-R studies 2027
-
5–15 Apr 2027 CPM 27-2 final report
-
RTO Prep meetings 2027
-
11–15 Oct 2027 RA-27
-
18 Oct–12 Nov 2027 WRC-27
Spotted an inaccuracy in this analysis? Please let us know via the contact form →
Source: ITU Radio Regulations, editions of 2008, 2012, 2016, 2020 and 2024. The English, French and Spanish texts are each taken from the official edition in that language, not translated from one another. Sources and citation.